The accumulated cement dispatch in Saudi Arabia declined in the first 9 month 2023 by -5.6% to a volume of 36.098 Mt, after 38.240 Mt in the same period 2023. In September 2023 only 4.092 Mt have been dispatched, which is -8.5% of the dispatch in September 2022.