WHR system planned at Çimsa Eskisehir, Türkiye
An ORC-based waste heat recovery (WHR) system will be installed at the Eskisehir cement plant of Çimsa in Türkiye by the end of 2024. This organic rankine cycle WHR system is designed to produce a gross power of 5.9 MW,…