WHR system planned at Çimsa Eskisehir, Türkiye

CIMSA WHR

An ORC-based waste heat recovery (WHR) system will be installed at the Eskisehir cement plant of Çimsa in Türkiye by the end of 2024. This organic rankine cycle WHR system is designed to produce a gross power of 5.9 MW, which corresponds to about 25% of the electricity consumption of the Eskisehir cement plant, avoiding 19000 t of CO2 equivalent emissions each year. The cutting-edge technology is provided by CTP Team (Italy) and CTN Group (Türkiye). The order has been awarded by Enerjisa Enerji, another subsidiary of the Sabancı Group, which also owns Çimsa.