
In the 1H in 2026, T+T’s (Trinidad + Tobago’s) cement production decreased by -16.5% to 0.315 Mt, after 0.377 Mt in the same period last year and 0.334 Mt in the year before.

In the 1H in 2026, T+T’s (Trinidad + Tobago’s) cement production decreased by -16.5% to 0.315 Mt, after 0.377 Mt in the same period last year and 0.334 Mt in the year before.