Germany’s cement prices down -8.5% in Jan 2025

In January 2025, the ex-works cement prices in Germany (calculated from cement volume and cement T/O) declined by -8.5% to 113.29 €/t, after 123.81 €/t in January 2024.
In January 2025, the ex-works cement prices in Germany (calculated from cement volume and cement T/O) declined by -8.5% to 113.29 €/t, after 123.81 €/t in January 2024.
In January 2025, Germany’s cement production increased by +30.3% to 1.163Mt, after 0.893 Mt in the same period last year and 1.384 Mt in the year before.
Germany’s Heidelberg Materials signed an agreement with Pronto to deploy their autonomous haulage system (AHS) to over 100 trucks, operating across more than a dozen sites worldwide. The AHS software learns a haul route from a quarry operator driving a vehicle…
The annual cement production in Germany declined by -4.9% to 24.268 Mta, after 25.513 Mta in the last year and 30.235 Mta in 2022.
In October 2024, the ex-works cement prices in Germany (calculated from cement volume and T/O) are almost stable at 118.07 €/t, after 117.22 €/t in June 2024.
In the first 11 months in 2024, Germany’s cement production declined by -5.6% to 22.740 Mt, after 24.090 Mt in the same period last year and 28.261 Mt in the year before.
The KHD Group will be carrying out a FEED (Front-End Engineering Design) study for the new Oxyfuel kiln at Heidelberg Materials’ Geseke cement plant in Germany. The contract is part of the planning phase of the GeZero CCS project, which…
Capsol Technologies has signed a contract with Holcim Group for the carbon capture project at Holcim’s Dotternhausen plant in Southern Germany. The contract includes the delivery of a carbon capture demonstration campaign, based on the CapsolEoP® (End-of-Pipe) technology. The technology…
In the first 10 months in 2024, Germany’s cement production declined by -6.8% to 20.481 Mt, after 21.979 Mt in the same period last year and 25.626 Mt in the year before.
Heidelberg Materials signed a front-end engineering and design (FEED) contract with the Fluor Corporation for its GeZero CCS-project in Geseke in Germany, where a second generation new oxyfuel kiln for the capture of 0.7 Mta will be installed (illustration). Fluor…