
JSW Cement has commissioned its greenfield integrated plant in Nagaur in Rajasthan, its first such facility in North India. The new plant of the green cement producer has a clinker production capacity of 3.3 Mta and a cement capacity of 2.5 Mta, which will be expanded by 1.0 Mta with another grinding unit. The plant is designed as a model of sustainable manufacturing and is equipped with a 7 km long overland belt conveyor to transport limestone from the mines and reduce the impact of road transports. Soon, the facility will also be equipped with a co-processing system for alternative fuels and will feature a 16 MW WHR system to capture waste heat from the production process, significantly reducing the carbon footprint of the plant. Now, JSW Cement’s cement grinding capacity stands at 24.1 Mta.
